EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
RANS21RB
-
Listing of Entries
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (678)
Research
Workshop
- (4)
Empennage
- (37)
Fuselage
- (155)
Firewall
- (19)
Tail Feathers
- (4)
Wings
- (99)
Controls
- (20)
-
Elevator balance
-
Stick Grips
-
Rudder Cable Return Kit
-
Aileron Servo
-
Aileron Cables
-
Elevator Push Pull Tube
-
Cockpit
-
Flap Control Assembly
-
Elevator push pull tube
-
Brake cylinders and...
-
Control assembly
-
Right Aileron
-
Right Aileron
-
Left Aileron
-
Flaps/Ailerons
-
Flaps/Ailerons
-
Flaps and Ailerons
-
Flaps
-
Flaps
-
Flaps
Avionics
- (52)
Lighting
- (9)
Instrument Panel
- (8)
Landing Gear
- (6)
Engine
- (82)
Propeller
Fuel System
- (6)
Interior Finish
- (28)
Paint / Decals
- (90)
Inspection
- (4)
Tools
Inventory
- (3)
Kit Delivery
- (1)
Reassembly
- (51)
Builder Name:
Randall Brooks
-
Project:
Rans - S-21 Outbound
-
VIEW REPORTS
Total Hours:
1990
Total Flight Time:
Start/Last Date:
Apr 03, 2021 - No Finish Date
Engine:
Titan IO-340 180HP
Propeller:
Whirlwind
Friendly URL:
https://eaabuilderslog.org?s=RANS21RB
Home or Last Project Picture
Oct 06, 2021
Right Aileron
- (2 hours)
Category: Controls
Finished clecoing Rt Aileron. Match drilled bottom skin to ribs and leading edge of top skin to spar. Removed clecos for deburring and cleaning.
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.